Search

Paul's Blog

  • Home
    Home This is where you can find all the blog posts throughout the site.
Posted by on in Uncategorized
  • Font size: Larger Smaller
  • Hits: 150

Danger Shift

When I started at the Edmonton Sun the boss who prepared the shift rota wouldn't post it until the Friday before the Monday that it took effect. So, you didn't know if you were working on Monday until preceding Friday. Hard to plan a life. Which I suspect was the point. The uncertainty definitely made it very difficult to have much of a social life, never mind a marriage. Which in turn hurt the old Work-Life Balance. A new boss meant a new approach. On a five or six week cycle, you moved up a place in the rota and every week started an hour or so later than in the previous week. And you also knew well way ahead of time which weekends you would be working. The downside was that one week you were starting at, say 2pm, and finishing at 10pm then the following week as you moved to the beginning of the rota cycle again you were starting at 10am and finishing around 6pm. That's a big adjustment for a body clock to make. In fact it's a downright unhealthy adjustment. Swings and roundabouts.

0

Paul Cowan has not set their biography yet

Author's recent posts
Go to top